IPP720
IPP960
IPP1050
IPP1300
Installation area
20m(W)×20m(H)×6m(H)
25m(W)×20m(H)×6m(H)
25m(W)×20m(H)×6m(H)
10m(W)×15m(H)×6m(H)
Required power
400KW
600KW
600KW
400KW
Total weight
7.5Ton
10Ton
12Ton
14Ton
Press pressure
15Ton/Unit
60Ton/Unit
60Ton/Unit
60Ton/Unit
Standard set
3 set
3 set
3 set
1 set
Equipment production time
80days
90days
90days
75days
Equipment Installation time
20days
25days
25days
15days
Education time
15days
15days
15days
15days
Required worker
4 people
4 people
4 people
2 people
IPP2430
IPP960FD
IPP1300FD
Installation area
20m(W)×20m(H)×6m(H)
26m(W)×20m(H)×5m(H)
30m(W)×20m(H)×5m(H)
Required power
580KW
600KW
400KW
Total weight
25Ton
14Ton
20Ton
Press pressure
120Ton/Unit
60Ton /Unit
60Ton /Unit
Standard set
1 set
3 set
1 set
Equipment production time
85days
90days
75days
Equipment Installation time
20days
25days
20days
Education time
15days
15days
15days
Required worker
2 people
3 people
2 people
1. MOLDING LIST
1. Suction Part
2. Up/Down Block Part
3. Transfer Block Part
4. Frame Part
2. VACUUM PARTS
1. Pump Type: Liquidring Pump
2. Vacuum Pressure : 680mmHg
3. Motor : ,380v,3Phase
4 Dewatering Section
5. Vacuum Section
3. HYDRAULIC PARTS
1. Oil pump Type : Double Vane Pump
2. Motor : 380V,3Phase
3.Pressure : Normal 70K, Max 140K
4. CONTROL PANEL PARTS
1. Heater Panel : SCR Control
2. MCC Panel
3. PLC Panel
4. Touch Screen
5. COMPRESSOR PART
1. Screw type air compressor
2. Motor : 380V
3. Air dryer
4. After cooler
5. Air receiver tank
6. Main , pre, line filter
6. TANK PARTS
1. Supply Tank
2. Storage Tank
3. White Water Tank
4. Sealing Water Tank(PE)
5. Fresh Water Tank (PE)
7. PULPER
1. Square Type
2. Capacity :5§©
3. Pulping Consistency : Max 2%
4. Motor : 380V,3Phase
36-7, Samsumun-gil, Jangan-myeon, Hwasung-si, Gyeonggi-do, Korea
Phone: 82-31-351-8240 Fax: 82-31-351-8245
Copyright (c) since 2003
Ipsung Co., Ltd.
All right reserved.